Previous Topic

Next Topic

Book Contents

Book Index

Send Feedback

Crane Synchronisation - Menu Item

The Crane Synchronisation menu is protected by a PIN number to prevent unauthorised or untrained access. It is highly recommended that only trained personnel perform crane synchronisation.

Crane synchronisation is the process of matching the speed of the front and rear cranes in Low Speed only. If they are "out of sync", one function will appear to move faster than the other.

The cranes are synchronised before the trailer leaves the factory. However, if you notice that the cranes are operating at different speeds, it is possible to synchronise the cranes again by following the procedure below. This is not uncommon after about 50 hours of use, by which time the hydraulics have bedded in a little.

In This Section

How to Synchronise the Cranes

Testing the Synchronisation Settings

See Also

Sidelifter Combined Operator Manual

Warranty Summary

Foreword

Owner and Operator Responsibilities

General Description

Commissioning Checks

Commissioning the Sidelifter

Main Components Traversing Model

Main Components Fixed Module Models

Main Components Truck Mounted Models

Digital Control Operating System

Radio Remote

Sidelifter Starting Procedure

Sidelifter Shutdown Procedure

Operational Modes

Electrical System - Digital

Display Screen

Dangerous Goods Specifications

SMARTlift Load Monitoring System (Optional)

Troubleshooting

SL0005 Calibrating SMARTlift Angle Sensors Using the Plumb Bob Method

Crane Operations

Recommended Companion Vehicles

Maintenance

Notes on Tractor/Semi Trailer Operation