Test the settings when lifting a 15-20 tonne container to check that the arms are synchronised under normal loading and unloading conditions. Small adjustments of the percentage values may be required to achieve this.
|
Try slowing down the fast arm instead of speeding up the slow arm as you run the risk of running out of available oil flow to gain speed / synchronisation. Remember to actuate both front and rear cranes simultaneously when doing the timing. |