Previous Topic

Next Topic

Book Contents

Book Index

Send Feedback

Overriding the E-Stop Circuit

This applies only to units fitted with digital or SMARTlift control units.

Sidelifter control valves have manual levers located in the cylindrical container in the side tool box. In the event of an electrical breakdown, the operating cycle can be completed manually by using these levers, but the load sense dump solenoid must be energised first.

You can override the E-stop circuit and energise the load sense pump solenoid by pressing the rubber covered button in the left hand end of the start-key 'E' junction box.

See Also

Radio Remote

Operator Controls

Operator Controls - Hetronic

Operator Controls - HBC

Emergency Stop

Radio Remote Battery Charging System - Hetronics

Radio Remote Battery Charging System - HBC

Safe Mode