S0029 PDF File |
Structural |
Version 1 |
18 Jan 07 |
For location of pins, refer to S0028 Crane Pin Names.
This procedure is for service workshop use.
Heating of the retaining bolt heads may be required to break Loctite. |
I. For models with 16mm centre plugs:
II. For models without central plugs e.g. older SB360's:
Use the same procedure in reverse to refit the Top Arm.
At this point if it is necessary to remove and inspect the G-Pin, refer to S0030 Removing and Replacing G Pin
For How to remove the Top Arm Cylinder, refer to S0031 Removing Top Arm Cylinder.