Test the settings when lifting a 15-20 tonne container to check that the arms are synchronised under normal loading and unloading conditions. Small adjustments of the percentage values may be required to achieve this.
Try slowing down the fast arm instead of speeding up the slow arm as you run the risk of running out of available oil flow to gain speed / synchronisation. Remember to actuate both front and rear cranes simultaneously when doing the timing. |