Electrical power is supplied from the front services panel to the main junction box. The cable remote is plugged into this junction box (for radio control the receiver unit is plugged into this junction box).
The main junction box is connected to the two crane mounted junction boxes. If the Smartlift Control system is fitted, it is located on the chassis between the main junction box and the crane mounted junction box.