28 Nov 2005 PDF File |
Author: Neil Savage |
|
We have added two dia 16mm holes to the drawing S2-32493 (now rev C) to overcome reported problem of rainwater build-up inside the high crane base.
All SB121s in all markets
Holes can be added by service agents per our instructions
See red circled areas in drawing.