S0009 Procedure for Disassembly and Assembly of MK6 Bending Leg Option
S0009 PDF File
|
Version 2
|
Structure
|
17 August 2004
|
Disassembly:
- Undo 4 retaining screws and withdraw item 4 from item 2. Take care to support energy chain.
- Release item 3 from item 4.
- Remove pin K and slide out item 5 assembly and secure with a crane to prevent item 5 from falling to the ground.
- Release item 3 from item 5 and slide hoses out of energy chain.
- Remove pin "P" securing item 6.
- Slide assembly forward and rotate to expose pin "M". Undo grub screw and remove pin Y.
- Remove item 7 by partially retracting item 6 and rotate ankle to clear item 5.
- Extract item 6 and 8 from item 5. Note this must be removed out of P pin end of item 5.
- Remove hoses from hydraulic cylinder assembly (item 6). Note position of hose securing ties
Reassembly:
- Fit hoses to hydraulic cylinder assembly (item 6) and secure with ties as noted in disassembly 9. above
- Fit item 6 into opposite end to "K" pin of item 5.
- Fit item 7 to item 5 and secure with pin "M". Tighten grub screw
- Fit pin "P" securing item 6 cylinder.
- Slide hoses from item "6" through energy chain item 3 and secure one end of item 3 to item 5.
- Offer up item 5 assembly to item 2 and slide inwards until item 3 protrudes out of the rear of item 2.
- Align hoses and secure item 4 to item 3 and carefully slide item 4 into item 2. Secure with four screws to item 2.

